Wednesday, April 8, 2009

Inventory Management

Inventory management means more than just physical inventory. Inventory management requires control of and agreement between stock and stock records, accurate control procedures, evaluating usage, and anticipating requirements.

INVENTORY CONTROL PROCEDURES

Inventory control procedures mean providing for the availability of material, where, when, and in the kind and quantities required. It means balancing requests against available funds and purging storerooms of stock no longer applicable to installed equipment or in unserviceable condition. It means knowing the best levels of supply to be maintained and developing a sound review procedure to make sure supply adjustments are timely and accurate.

Consumables

Consumables are in the custody of the supply officer when storage permits. You can carry a small amount of consumables such as cleaning supplies, various amounts of office supplies, and some paint. Stocked consumables (items carried as supply department stock) are managed by the supply officer whether such items are stored in supply department spaces or in other department spaces. Remember, you need the approval of the commanding officer to store your stock in another department’s spaces. All nonstocked consumables are in the custody and under the management of the other department heads

Maintenance Assistance Modules

MAMs are usually in the custody of the appropriate department head and should be located in the appropriate operating and maintenance spaces under the subcustody of operating/maintenance personnel. MAMs are replaceable modules required to execute an approved maintenance plan that calls for identifying the fault of a failed module through progressive or selective module substitution. MAMs will appear in your COSAL. When a MAM has replaced a bad one in the equipment, that department or work center is required to submit the proper paper work to the supply department to replace the one actually used.

Ready Service Spares

RSSs are repair parts that are in the custody of the appropriate department head. These repair parts and spares are designated by the Hardware Systems Command during maintenance engineering analysis to be stored in or near certain equipment for troubleshooting and for effecting rapid equipment repairs. These spares will appear in your COSAL and may also appear in section IIIA of your COSAL as items that you could stock if usage warrants as backup.

Tuesday, April 7, 2009

What exactly ISO is?

ISO (International Organization for Standardization) is the world's largest developer and publisher of International Standards.
ISO is a network of the national standards institutes of 159 countries, one member per country, with a Central Secretariat in Geneva, Switzerland, that coordinates the system.
ISO is a non-governmental organization that forms a bridge between the public and private sectors. On the one hand, many of its member institutes are part of the governmental structure of their countries, or are mandated by their government. On the other hand, other members have their roots uniquely in the private sector, having been set up by national partnerships of industry associations.
Therefore, ISO enables a consensus to be reached on solutions that meet both the requirements of business and the broader needs of society.
Because "International Organization for Standardization" would have different acronyms in different languages ("IOS" in English, "OIN" in French for Organisation internationale de normalisation), its founders decided to give it also a short, all-purpose name. They chose "ISO", derived from the Greek isos, meaning "equal". Whatever the country, whatever the language, the short form of the organization's name is always ISO.
Standards make an enormous and positive contribution to most aspects of our lives.
Standards ensure desirable characteristics of products and services such as quality, environmental friendliness, safety, reliability, efficiency and interchangeability - and at an economical cost.
When products and services meet our expectations, we tend to take this for granted and be unaware of the role of standards. However, when standards are absent, we soon notice. We soon care when products turn out to be of poor quality, do not fit, are incompatible with equipment that we already have, are unreliable or dangerous.
When products, systems, machinery and devices work well and safely, it is often because they meet standards. And the organization responsible for many thousands of the standards which benefit the world is ISO.
When standards are absent, we soon notice.
ISO standards:
* make the development, manufacturing and supply of products and services more efficient, safer and cleaner * facilitate trade between countries and make it fairer * provide governments with a technical base for health, safety and environmental legislation, and conformity assessment * share technological advances and good management practice * disseminate innovation * safeguard consumers, and users in general, of products and services * make life simpler by providing solutions to common problems
Who standards benefit
ISO standards provide technological, economic and societal benefits.
For businesses, the widespread adoption of International Standards means that suppliers can develop and offer products and services meeting specifications that have wide international acceptance in their sectors. Therefore, businesses using International Standards can compete on many more markets around the world.
For innovators of new technologies, International Standards on aspects like terminology, compatibility and safety speed up the dissemination of innovations and their development into manufacturable and marketable products.
For customers, the worldwide compatibility of technology which is achieved when products and services are based on International Standards gives them a broad choice of offers. They also benefit from the effects of competition among suppliers.
For governments, International Standards provide the technological and scientific bases underpinning health, safety and environmental legislation.
For trade officials, International Standards create "a level playing field" for all competitors on those markets. The existence of divergent national or regional standards can create technical barriers to trade. International Standards are the technical means by which political trade agreements can be put into practice.
For developing countries, International Standards that represent an international consensus on the state of the art are an important source of technological know-how. By defining the characteristics that products and services will be expected to meet on export markets, International Standards give developing countries a basis for making the right decisions when investing their scarce resources and thus avoid squandering them.
For consumers, conformity of products and services to International Standards provides assurance about their quality, safety and reliability.
For everyone, International Standards contribute to the quality of life in general by ensuring that the transport, machinery and tools we use are safe.
For the planet we inhabit, International Standards on air, water and soil quality, on emissions of gases and radiation and environmental aspects of products can contribute to efforts to preserve the environment.

::Courtesy - www.iso.org::

Monday, April 6, 2009

Inventory Management

To minimize supply and demand imbalances in the supply chain, firms utilize various methods of inventory management. The problem is complicated by the fact that demand is uncertain, and this uncertainty can cause stockouts in which inventory is depleted and orders cannot be filled.Here, we discuss a model in which the inventory level is reviewed periodically, and orders are placed at regular intervals to order up to a certain base stock. This policy is known as a Policy of Periodic Review, Order-Up-To Base Stock.Under this policy, one orders a variable quantity Q every fixed period of time p in order to maintain an inventory position ( Qty on hand + Qty on order ) at a predefined base stock level S, also known as the "order-up-to level." The base stock level S is determined by calculating the quantity needed between the time the order is placed and the time that the next period's order is received, and adding a quantity of safety stock to allow for variation in the demand.The time between the placing of the order and the receiving of the next period's order is the sum of the review period p and the replenishment lead time l (lower-case L). The demand per unit of time, μ , is multiplied by the time between order placement and the next period's order arrival ( p + l ) to determine the expected quantity to be sold. The safety stock depends upon the variability in the demand and the desired order fill rate.To calculate the safety stock, first calculate the standard loss function, designated as L(z). This function is dependent on the values of the desired fill rate f, the demand μ and its standard deviation σ , the time between orders p, and the replenishment lead time l :L(z) = ( 1 - f ) µ p / σ ( p + l )1/2
Once L(z) is known, z can be found in a look-up table and the safety stock can be calculated by:
Safety Stock = z σ ( p + l )1/2
If the review period p is reduced, the safety stock does not necessarily reduce because p is in both the numerator and denominator of the standard loss function which determines the value of z.The average level of on-hand inventory is the sum of the cycle stock ( equal to µp/2 ) and the safety stock. The on-hand inventory does not include those units in the delivery pipeline.This model can be complicated by the following real-world issues: variable lead times, non-stationary demand, multiple inventory sites, multiple customer classes, and multi-item order fill rate.When several components are needed to build a system, each component having the same fill rate, the overall system order fill rate (multi-item fill rate) will be lower than the component fill rate since an order cannot be completed even if only a single component is missing. The multi-item fill rate is the product of the individual item fill rates. For n items having the same component fill rate:
order fill rate = (component fill rate)n
When there are long shipping times, the idea of postponing the last stages of final assembly until the product reaches the distribution center (DC) may become attractive. At the DC, the units can be localized and customized according to the demand patterns seen at that time. The result is that the total safety stock required at the DC is reduced by a factor of n1/2, where n is the number of different SKU's for which the customization is being postponed.
To maximize the benefits of postponement, the product should be designed to be distribution center localizable. The variable features of the product can be isolated into one or two modules that are to be installed in the distribution center.

Thursday, April 2, 2009

ERM - What does it mean?

What is ERP
ERP is the acronym of Enterprise Resource Planning. ERP utilizes ERP software applications to improve the performance of organizations' resource planning, management control and operational control. ERP software is multi-module application software that integrates activities across functional departments, from product planning, parts purchasing, inventory control, product distribution, to order tracking. ERP software may include application modules for the finance, accounting and human resources aspects of a business.

ERP vs. CRM and SCM
CRM (Customer Relationship Management) and SCM (Supply Chain Management) are two other categories of enterprise software that are widely implemented in corporations and non-profit organizations. While the primary goal of ERP is to improve and streamline internal business processes, CRM attempts to enhance the relationship with customers and SCM aims to facilitate the collaboration between the organization, its suppliers, the manufacturers, the distributors and the partners.

ERP Definition - A Systems Perspective
ERP, often like other IT and business concepts, are defined in many different ways. A sound definition should several purposes:
It answers the question of "what is ... ?".
It provides a base for defining more detailed concepts in the field - ERP software, ERP systems, ERP implementation etc.
It provides a common ground for comparison with related concepts - CRM, SCM etc.
It helps answer the basic questions in the field - benefits of ERP, the causes of ERP failure etc. A definition of ERP based on Systems Theory can server those purposes. ERP is a system which has its goal, components, and boundary.
The Goal of an ERP System - The goal of ERP is to improve and streamline internal business processes, which typically requires reengineering of current business processes.
The Components of an ERP System - The components of an ERP system are the common components of a Management Information System (MIS).
ERP Software - Module based ERP software is the core of an ERP system. Each software module automates business activities of a functional area within an organization. Common ERP software modules include product planning, parts purchasing, inventory control, product distribution, order tracking, finance, accounting and human resources aspects of an organization.
Business Processes - Business processes within an organization falls into three levels - strategic planning, management control and operational control. ERP has been promoted as solutions for supporting or streamlining business processes at all levels. Much of ERP success, however, has been limited to the integration of various functional departments.
ERP Users - The users of ERP systems are employees of the organization at all levels, from workers, supervisors, mid-level managers to executives.
Hardware and Operating Systems - Many large ERP systems are UNIX based. Windows NT and Linux are other popular operating systems to run ERP software. Legacy ERP systems may use other operating systems.
The Boundary of an ERP System - The boundary of an ERP system is usually small than the boundary of the organization that implements the ERP system. In contrast, the boundary of supply chain systems and ecommerce systems extends to the organization's suppliers, distributors, partners and customers. In practice, however, many ERP implementations involve the integration of ERP with external information systems.

Purchase Requisitions & Purchase Orders

Purchase Requisition
*A purchase requisition provides authorization for the Purchasing Department to initiate a purchasing transaction. The requisition form is available from the Purchasing Department, and contains a complete list of information that is required to complete a purchasing transaction.
*A purchase requisition that is prepared without all of the required information will be returned to the staff member for completion, and may delay the ordering and/or delivery of the requested goods or services.
*The value of the goods and services will determine the process that the purchasing department will follow to create a PO.

Purchase Order
*A completed purchase requisition will be reviewed and approved in the Purchasing Department according to the University’s policy for requisition approval. Once the requisition has been approved, it will be used to create a Purchase Order (PO).
*When the supplier receives their copy of the PO and confirms acceptance of the information and terms, the PO becomes a formal contract between the University and the supplier for that specific transaction.
*Both parties are required to comply with the terms on the PO as they would with a regular contract.
*The Purchasing Department will send a copy of the PO to the employee to confirm that the PO was sent to the supplier and to act as documentation during the receiving process.

Wednesday, April 1, 2009

Organize Material - All Tips you needed

Organize/store your slides, reviews, invitations, support materials, etc.Good organization of your support materials will make your life that much easier. Needless to say, if a good bulk of your work is done on the computer, make sure that you save your files on disks, as well as having them on your hard drive. We have heard too many horror stories of: my only version of the manuscript/grant was on my hard drive that crashed!!

Unsuspecting Disasters:
One should think about how to protect their documentation and support materials in case of a disaster (fire, flood, theft, etc.). We recommend that you document all of your work and keep a master set of the documentation and copies of your reviews, manuscripts, resumes, back up computer files on diskette, etc. in another site other than your studio/home. One artist told us that he keeps a set of his master slides in a fire and water proof box (he is an installation artists and if he loses his slides he has nothing to show anyone!!). We have also heard that some people keep their materials in a bank safety deposit box. Photographers should always store their negatives in a fireproof storage container.

For those who need visual support material:
slides and videos.One should make as many master quality versions of their support materials as possible. As was stated in the section of entitled, Documentation and Support Materials, instead of taking one slide of an artwork take five (or more) shots of that work. That way you have five originals/masters to make dups from. It will also be cheaper in the long run than getting all of those dups done. Clearly indicate which slides/videos/cds/dvds are the masters. Our Executive Director's master slides are always plastic mounted while her dups are always mounted in paper. Also remember to properly and consistently label your materials (see Documentation and Support Materials)

The Binder approach to storing your work.What you need:
Access to a computer & printerAt least two big 3 ring binders (the more materials you have the more binders you will need).Plenty of plastic slide sheetsPlenty of plastic sleeves to store 8 1/2 x 11" documentsPlenty of plastic sleeves for your photos/press photos (only if you have photos)(If you are a photographer, as you know that you will also need plenty of negative sheets)
In one binder you will chronologically organize your entire career (you might need more binders depending on your career). This process will take time, maybe up to a week, but it is really worth it.
For example, each show/event that you are cataloging in you binder, you would gather all of the extra invites/programs you have left over from the show/event and you would put them into a plastic shelve. You also would put copies of the show's press release in another sleeve, copies of any reviews/press, your artist statement for that particular show, thank you letters, photographs, etc.. in their own individual shelves. You should always have at least five extra copies of "print materials" on hand in each of the sleeves (ie five copies of a review of your work, etc.). This will save you time when you are putting together packages to send out. You won't have to waste time copying at the last minute.
If you are in a discipline that requires such visual support materials

The master set of slides (or photographs)
A master set of all your slides should also be in this binder. These slides should all be originals and of the best quality. Again, arrange the slides chronologically. HOWEVER, unlike your support materials, arrange the slides so your oldest work comes first. (this will be explained as to why latter).
What we mean by a master set of slides is the following:Example one:Let's say you have slide documentation of a painting. You have one shot of the entire painting and you have two different detail shots of the painting. PUT one copy all of the images of the painting in this master set of all your slides (ie all 3 slides).

Example two:
Let's say that you are an installation artist and you recently shot slide documentation one of your large scale installations. You will put one copy of all of the slides that you shot of this installation in this master set of all your slides.

Arrange your slides the following way in the slide sheets (or if you have photos do it the same way):On the master set of slides, put your oldest work first, and your most recent work last in the sheet (So your oldest piece would be number #1 on the corresponding slides sheet).

The Corresponding master slide sheet:Now make a master slide sheet for the master set of slides. Number the slides in pencil. Your oldest work will be number #1 on the corresponding master slide sheet. SO when you need to add slides to the master set of slides, it will be easier to add the slides and it will also be easier to add the new slides to your master slide sheet (ie you will only have to add numbers and new slide sheets instead of renumbering and rearranging every slide!!!).

At the very front of the binder, after you have arranged all of your shows chronologically with the most recent at the front of the binder, you should have several copies of an up to date resume (in its own sleeve) as well as copies of all the versions of your up to date artist statements (please see the section on how to write an artist statement!), a brief biography on your self (no longer than one page) and if you have made them, copies of your annotated/descriptive slide sheets (see the section on Documentation and Support Materials). Your master set of slides and corresponding master slide sheets should come after this section.
What to do with the other binders:All of the dups or extra slides you have of your work should also put into slide sheets and into binders. HOWEVER, they should be arranged the following way: Each piece/work should have its own slide sheet(s). Multiples of an image should be grouped together (ie let's say you have a bed sculpture. You group all the details of one shot together , etc.. in total you have 18 slides of this one bed sculpture on all one slide sheet). The slides of your most recent work should be at the front of the binder.

Why do this?
You will now have one big binder of your most recent shows and all of your slides in both an easy to transport format and in very easy format to show to interested people (and if there is a fire you can easily grab it). This format will also make it that much easier for you to put packets together to send out.

How you ask?
By having the master slide sheet, the master set of slides and your dups arranged this way it will be so much easier to select slides of your work to send out. You can just go through your master set of slides and select the slides you want to send out. You would then go to the binders that have the extra slides and make the slide sheet from this inventory of slides. And your slide sheet is already typed/done. All you need to do is to cut and paste from your master slide sheet!

What is Kanban system

Kanban
A system of continuous supply of components, parts and supplies, such that workers have what they need, where they need it, when they need it.The word Kan means "card" in Japanese and the word "ban" means "signal". So Kanban refers to "signal cards".
Working of KanbanLet's say one of the components needed to make widgets is a 42" stem-bolt and it arrives on pallets. There are 100 stem-bolts on a pallet. When the pallet is empty, the person assembling the widgets takes a card that was attached to the pallet and sends it to the stem-bolt manufacturing area. Another pallet of stem-bolts is then manufactured and sent to the widget assembler.
A new pallet of stem-bolts is not made until a card is received.This is Kanban, in it's simplest form.A more realistic example would probably involve at least two pallets. The widget assembler would start working from the second pallet while new stem-bolts were being made to refill the first pallet.
If this was a high volume widget manufacturing facility, each widget assembly station might empty a pallet of stem-bolts in just a few minutes, and there could be 15 or 20 widget assembly stations. Thus there would be a continual flow of cards going back to the stem-bolt manufacturing area that would cause a continual flow of pallets of stem-bolts to be sent to the widget assembly stations.
Kanban is Pull (Demand)This is called a "pull" type of production system. The number of stem-bolts that are made depends on the customer demand--in other words the number of cards received by the stem-bolt manufacturing area.
Systems other than cards may be used. For example, the empty pallets may be returned to the stem-bolt manufacturing area. Each empty pallet received indicates a need to manufacture 100 more stem-bolts. For other types of components, bins, boxes or cages might be used instead of pallets. Or components might be stored on shelves in the widget assembly area. When a shelf became empty that signals that more components need to be manufactured and the shelf refilled.In Kanban the method of handling the components is flexible, and depends on the needs of the manufacturing process.
An Alternative Kanban ModelKanban can also operate like a supermarket. A small stock of every component needed to make a widget would be stored in a specific location with a fixed space allocation for each component. The widget assemblers come to the "supermarket" and select the components they need. As each component is removed from the shelf, a message is sent to a "regional warehouse" or component manufacturing facility, requesting that the component be replaced. The "supermarket" might then receive a daily shipment of replacement components, exactly replacing those that were used.
If we just change the term "supermarket" to "warehouse" we have our manufacturing example.
This "supermarket" model is different from the first Kanban example in that it would be used when components are manufactured in facilities that are distant from the widget assembly plant. Instead of moving around small quantities of components, larger quantities are shipped once a day to the centralized warehouse.
Kanban - Responsive To CustomersKanban results in a production system that is highly responsive to customers. In the above example, the production of widgets will vary depending on customer demand. And as the widget demand varies, so will the internal demand for widget components. Instead of trying to anticipate the future (predicting the future is difficult) , Kanban reacts to the needs.
Kanban does not necessarily replace all existing material flow systems within a facility. Other systems such as Materials Requirement Planning (MRP) and Reorder Point (ROP) may remain in operation. Kanban is most beneficial when high volume/low value components are involved. For low volume and high value components, other materials management system may be a better option.
JIT - Just In Time / Continual ImprovementKanban is directly associated with Just-In-Time (JIT) delivery. However, Kanban is not another name for just-in-time delivery. It is a part of a larger JIT system. There is more to managing a JIT system than just Kanban and there is more to Kanban than just inventory management.
For example, Kanban also involves industrial re-engineering. This means that production areas might be changed from locating machines by function, to creating "cells" of equipment and employees. The cells allow related products to be manufactured in a continuous flow.
Kanban involves employees as team members who are responsible for specific work activities. Teams and individuals are encouraged participate in continuously improving the Kanban processes and the overall production process.
Kanban is not a system indented to be used by itself. It is an intregal part of Kaizen and 5S.
Kanban Scheduling SystemsKanban scheduling systems operate like supermarkets. A small stock of every item sits in a dedicated location with a fixed space allocation. Customers come to the store and visually select items. An electronic signal goes to the supermarket's regional warehouse detailing which items have sold. The warehouse prepares a (usually) daily replenishment of the exact items sold.
In modern supermarkets Kanban signals come from checkout scanners. They travel electronically (usually once a day) to the warehouse. Smaller stores still use visual systems. Here, a clerk walks the aisles daily. From empty spaces he deduces what sold and orders replacements. Another variation is the bread truck. Here drivers follow a fixed route from store to store. They have a supply of bakery items in their truck. At each stop, they examine the stock and replenish what has been sold.
Kanban scheduling in manufacturing works in the same way. The essential elements of a system are:
Stockpoint(s) A Withdrawal Signal Immediate Feedback Frequent Replenishment Benifits of Kanban
Kanban provides a number of benefits i.e.
Reduce inventory and product obsolescence.Since component parts are not delivered until just before they are needed, there is a reduced need for storage space. Should a product or component design be upgraded, that upgrade can be included in the final product ASAP. There is no inventory of products or components that become obsolete.
This fits well with the Kaizen system on continual improvement. Product designs can be upgraded in small increments on a continual basis, and those upgrades are immediately incorporated into the product with no waste from obsolete components or parts.
Reduces waste and scrap.With Kanban, products and components are only manufactured when they are needed. This eliminates overproduction. Raw materials are not delivered until they are needed, reducing waste and cutting storage costs.
Provides flexibility in production.If there is asudden drop in demand for a product, Kanban ensures you are not stuck with excess inventory. This gives you the flexibility to rapidly respond to a changing demand.Kanban also provides flexibility in how your production lines are used. Production areas are not locked in by their supply chain. They can quickly be switched to different products as demand for various products changes. Yes, there are still limits imposed by the types of machines and equipment, and employee skills, however the supply of raw materials and components is eliminated as a bottleneck.
Increases OutputThe flow of Kanban (cards, bins, pallets, etc.) will stop if there is a production problem. This makes problems visible quickly, allowing them to be corrected ASAP.Kanban reduces wait times by making supplies more accessible and breaking down administrative barriers. This results in an increase in production using the same resources.
Reduces Total CostThe Kanban system reduces your total costs by:
Preventing Over Production Developing Flexible Work Stations Reducing Waste and Scrap Minimizing Wait Times and Logistics Costs Reducing Stock Levels and Overhead Costs Saving Resources by Streamlining Production Reducing Inventory Costs